NBN outages and service status in St Helena, Victoria
No problems detected
If you are having issues, please submit a report below.
- NBN generated 0 outage signals in the last 24 hours around St Helena, including 0 direct reports.
The National Broadband Network (NBN) is an Australian national wholesale open-access data network project and offers landline phone and internet network.
Problems in the last 24 hours in St Helena, Victoria
The chart below shows the number of NBN reports we have received in the last 24 hours from users in St Helena, Victoria and surrounding areas. An outage is declared when the number of reports exceeds the baseline, represented by the red line.
At the moment, we haven't detected any problems at NBN. Are you experiencing issues or an outage? Leave a message in the comments section!
Community Discussion
Tips? Frustrations? Share them here. Useful comments include a description of the problem, city and postal code.
Beware of "support numbers" or "recovery" accounts that might be posted below. Make sure to report and downvote those comments. Avoid posting your personal information.
NBN Issues Reports
Latest outage, problems and issue reports in social media:
-
MR Reilly (@mrr78504) reported@econoadabsurdam @LeeRespecter The NBN might plausibly have increased productivity if it had retained its original scope (A FTTN fibre backbone network independent of Telstra that would allow telecommunication companies to compete on an equal footing). Instead it got rolled out first in Tasmania.
-
The InfraDev (@theinfradev) reported@malimber01 @robb_j_m What are you talking about. The NBN was created from nothing and only cost so much in the end because it was saddled with Telstra's **** copper infra by the libs and had to essentially build it twice.
-
Tze-wei Chong 🇦🇺🧢 (@Tze_C) reported@GeoffWilsonWAM @theAZtrader @ausgov Fully agree. Other than new property development which should still be benefit for housing supply. Poor structural reform that will impact future generations and brain drain Australia. Funding via NDIS / NBN restructure would have been far easier and more beneficial
-
AusTubers 🇦🇺 (@AusTubers) reported(sorry, I couldn't resist taking a jab at @NBN_Australia) (please don't give us another 3 day outage mr nbn man, please)
-
M (@imboudee) reported@THATS_RIGHT_YA @robb_j_m I doubt that’s a problem with the NBN infrastructure and perhaps more to do with your provider (TPG). I’m not sure what a 20 cm network cable has to do with much. At gigabit speeds I’d suggest a Cat7 network cable, to be sure to be sure. They’re fairly cheap nowadays.
-
Sharon Dresser (@DresserC33944) reported@dpoddolphinpro @Amazonleo @Starlink but ryan starlink is actually useable across most of the globe, leo isnt...and its latency is so slow is only good for wathcing the NSF streams , yeah its still faster than the NBN here in Australia with our crappy fibre to the node than four core coppeer to the home,
-
Jay (@TheGreenGoat79) reported@bobslidelx @JacintaAllanMP I've got 2 more weeks on current project than have about 20k of drilling left in sydney (installing goverment fibre optic network, like nbn but not ****) Then hopefully at the end of this year start of next we are either doing ali ce springs to darwin or toowoomba to chinchilla
-
Gregory Briscoe-Hough (@GBH0100) reported@news_australian Snowy 22b.0 man has as much credibility as his NBN (no bloody network) rollout achievement… worst Monister ever!!
-
Michael Brennan (@Michael44814776) reportedNo, nbn has cost far more due to LNP. LNP original costing: Promised $29.5B (2013 election); revised to $41B in Strategic Review. The evidence is that in the caucus , as detailed in Turnbull’s book, Abbott simply wanted LNP to be contrarian about nbn. They stopped the fibre rollout and replaced it with copper. At the time, LNPs message that nbn would go over budget was favoured due to a complicit media. For instance, when the ABC science editor did a comprehensive comparison between labour’s FTTP and LNP copper, the report was spiked until after the election, due to ABC management wanting to appease LNP. Then, under LNP, ABC did not have a science editor. Consider the subsequent dearth of reporting by ABC in following years about the biggest infrastructure project ever. Consider that Turnbull appointed a former business associate to be chair of ABC whilst a Director of NBN snd whilst a ceo of a supplier to NBN with a $100m contract for design and fabrication of copper based distribution boxes, which have subsequently been removed. So there is no surprise that the public were force fed the line that all that glitters is copper. The reality set in when the deterioration of the copper network became apparent to punters. The cost of NBN is now at approx $50B with $54B to 2030 to due to the replacement costs of LNPs copper systems with fibre. So Abbott and Turnbull cost the country many billions not to mention the years of misery and lost productivity by prolonging the copper network.
-
Orstraya (@orstraya) reported@eevblog How can an organisation like NBN not have its own HDD crews or a contractor on standby? Why does it need council permits to carry out emergency works when federal law lets telcos basically do what they want?